Little America –
I know it doesn’t look like much, but this is the spot where I will die someday – tools in hand, God willing.
Today Mike and I almost completed installing the underlayment for the new shop floor. We have just one more sheet to install, but it’s a tricky one. As we were shimming things up, the room filled with the sound of a big diesel engine.
The dude was here to help remove the sign from the exterior of our building.
While dispatching the sign took only 35 minutes, it was a significant psychological step for me. Neighbors gathered to watch the purple plastic “Blaze” sign come down in pieces. And with the sign gone, it finally felt like it was our building.
Today I also received shipment of our solid-oak flooring – 54 bundles of the stuff. It will acclimate in the new shop for a week before installation. Then the guys at Lovell’s Hardwood Flooring will do the rest. And thank goodness. I have to start building two tool chests starting Saturday.
— Christopher Schwarz